Engineering works at Haywards Heath. The up and down main are blocked but the loops remain open to traffic. This was the occasion the bridge decking was renewed. Slide undated but mid 1980's.
Categories & Keywords
Category:Transportation
Subcategory:Trains
Subcategory Detail:
Keywords:4BIG, 4CIG, British Rail, Class 73, Haywards Heath, engineering, work